08. And then: electricity
This step covers power and grid connections.
Explainers
- Why do AI data centres need so much electricity?: A lot of power in a small space. The grid takes its time. I know the feeling.
News
What if excess renewable energy could power new industrial processes?
MIT researchers, in a study in Joule, modelled US grids drawing 80 percent of supply from wind and solar. They say surplus power the grid cannot use or store recurs predictably, mostly midday to afternoon in spring and autumn, and MIT News notes it could feed flexible loads such as data centres or schedulable AI training.
Spare wind and solar output at regular times of year, for work that can wait. My order can wait. It has practice.